Skip to content
NSW Planning Portal checked every 15 minutes
LodgedLeads

From council register to inbox.

In the last 30 days 3,401 applications were lodged with NSW councils. We check for new ones every 15 minutes.

Three steps

  1. 1

    An application is published

    A homeowner, builder or developer lodges a development application with their council through the NSW Planning Portal, and it appears in the Portal's public data.

  2. 2

    We find it within minutes

    LodgedLeads checks the Portal every 15 minutes, reads the type of work, cost, storeys and dwellings, and works out which trades the job is relevant to.

  3. 3

    You get an email straight away

    If it matches your trades, councils and minimum job size, it is in your inbox in the same hour, with the address, the work proposed and the council reference.

What each lead contains

We never include owners' names or contact details. Data sources
Site address
Street, suburb and postcode, with a map link.
Proposed work
The development types on the application, such as swimming pool, secondary dwelling or demolition.
Declared cost
The estimated cost of development the applicant declared.
Size
New dwellings and storeys, where provided.
References
The Planning Portal number and council application number, for looking up plans on the council tracker.
Status
Under assessment, more information requested, on exhibition or determined.

How applications are matched to trades

TradeDevelopment types that match
Pool buildersSwimming pool, Portable swimming pools and spas and child-resistant barriers
Granny flat buildersSecondary dwelling, Manufactured home
New home buildersDwelling house, Semi-detached dwelling, Attached dwelling, Rural worker's dwelling
Renovation and extension buildersAlterations or additions to an existing building or structure, Minor building alterations (external), Minor building alterations (internal), Balcony, deck, patio, terrace or verandah, Balcony, deck, patio, terrace or verandah (screened enclosures), Skylights, roof windows and ventilators, Stairway
Demolition and skip binsDemolition
LandscapersLandscaping structures, Pathways and paving, Earthworks, retaining walls and structural support, Driveways and hard stand spaces, Swimming pool, Tennis courts
Fencing contractorsFences, Swimming pool, Portable swimming pools and spas and child-resistant barriers
Solar and electricalElectricity generating facility (solar and wind), Hot water systems, Air-conditioning units, Electric vehicle facility, Dwelling house, Secondary dwelling
Sheds, garages and carportsShed, Garage, carport or carparking space, Carport, Cabanas, cubby houses, ferneries, garden sheds, gazebos and greenhouses, Awnings, blinds and canopies, Shade structures of canvas, fabric, mesh or the like, Farm buildings, Farm building
Multi-unit and developmentDual occupancy, Dual occupancy (attached), Dual occupancy (detached), Multi-dwelling housing, Multi-dwelling housing (terraces), Medium Density Housing, Residential flat building, Shop top housing, Subdivision, Build-to-rent, Co-living, Seniors housing, Independent living units, Mixed use development
Commercial fit-outChange of use of land or a building or the classification of a building under the Building Code of Australia, Commercial development, Food and drink premise, Restaurant or cafe, Take away food and drink, Office Premise, Business premises, Retail Premise, Shop, Centre-based child care, Early Education and Care Facility, Medical centre, Health services facility, Small bar, Pub, Advertising and signage, Signage, Business identification sign, Neighbourhood shop, Neighbourhood supermarket, Specialised Retail Premises

What works for our customers

Write to the site
A short letter to the site address introducing your business, with a photo of a similar job and an offer to quote. It reaches the owner and respects their privacy.
Reach them before the tender
Many applications are lodged months before work starts. Owners are often still choosing a pool company, landscaper or fencer.
Talk to the builder or designer
Council documents usually name the designer or builder. They need reliable subcontractors and suppliers, and one relationship can bring repeat work.
Follow up on approval
Mark leads as contacted in your account. When an application changes to determined, work is usually about to be booked.

Please follow the Spam Act 2003 and the Do Not Call Register rules. We recommend addressed mail over cold calls.

Hear about the next job in your area first.

Start a free trial