Finding pool jobs in Sydney: where the new pools are being planned
280 development applications including a swimming pool were lodged with Greater Sydney councils in three months. Which councils lead, why almost half come with a new house, and how pool builders can hear about each one the evening it is lodged.
The LodgedLeads team · · 3 min read
Every new backyard pool that goes through council starts as a development application, and those applications are public. So instead of waiting for a quote request, a pool builder can see where pools are being planned, sometimes months before the excavator arrives. We looked at three months of NSW Planning Portal data to see what that looks like across Sydney.

The numbers: about three new pool applications a day
In the 90 days to 5 November 2026, 280 development applications that included a swimming pool were lodged with Greater Sydney councils, spread across 32 council areas. That’s about three every day, or around 90 a month.
It’s also steady. Across the past year, Sydney saw roughly 90 to 120 pool applications a month, with January the only clear dip, when the holidays slow everything down. There isn’t a short season to catch: the work keeps coming all year.
Where they are: the top councils
Pool applications follow new housing and bigger blocks. The busiest Sydney councils over those 90 days were:
- Wollondilly Shire: 35 applications
- Sutherland Shire: 31
- The Hills Shire: 29
- Camden: 29
- Northern Beaches: 20
- Penrith and Blacktown: 11 each
- Blue Mountains: 10
- Ku-ring-gai and Bayside: 9 each
The pattern makes sense: growth areas in the south-west and north-west, where new estates are being built on house-and-land lots, sit alongside established suburbs with large blocks, like the Shire and the Northern Beaches, where owners are adding pools to existing homes. You can see the current figures for every council on our pool builder leads page.
Almost half come with a new house
Of those 280 applications, about 130 also included a new dwelling house, often with demolition of the old one as part of a knock-down rebuild. For a pool builder that matters in two ways.
- The pool is part of a bigger project. The owner is talking to a builder, a designer and sometimes a landscaper at the same time. Getting in early, while the house is still being planned, puts you in the conversation before the pool goes to whoever the builder usually uses.
- The timeline is longer. A pool with a new house is built late in the project, so there may be months between the application and the dig. That’s time to quote properly, follow up, and plan your own schedule.
The other half are mostly pools added to existing homes, often listed as a new structure with the pool, sometimes with alterations or retaining walls. Those owners are usually ready to go once council approves.
What a pool lead tells you
Each application gives you the site address, the council, the application number, the description of the work and its status. It also gives the estimated cost of development, which for a new-house application covers the whole project, so treat it as a sign of the size of the build rather than the pool budget. The council’s tracker usually has the plans, which show the pool’s size and position and whether there’s a retaining wall or a slope to deal with.
How to make contact
Applications show the property, not the person: LodgedLeads doesn’t provide owners’ names or phone numbers. The approach that works best for most trades is a short, professional letter to the site address that mentions the application number, says what you do and where you’ve worked nearby, and invites them to get in touch. Keep it helpful rather than pushy, and if you contact anyone electronically, follow the Spam Act 2003 and Do Not Call Register rules.
Timing is the other half. The NSW Planning Portal publishes each day’s applications in an evening batch. A pool builder who has the list that night can have a letter in the post before most competitors know the job exists.
Get Sydney’s pool applications the evening they’re lodged
LodgedLeads checks the Planning Portal every 15 minutes. Choose pool builders as your trade, pick your councils or a distance from your yard, set a minimum job size if you like, and every matching application lands in your inbox that evening. You can also be told when each one is approved, which is when work can start.
It’s $79 a month including GST with a 14-day free trial, no card needed. Or get the free weekly sample of pool applications near you first.
Figures are from NSW Planning Portal development application data for applications lodged with Greater Sydney councils between 7 August and 5 November 2026 whose development types include a swimming pool. Pools approved as complying development (CDC) or exempt development are not included.
Data source: NSW Planning Portal, NSW Department of Planning, Housing and Infrastructure, under Creative Commons Attribution. About the data.