Skip to content
NSW Planning Portal checked every 15 minutes
LodgedLeads

Dual occupancy and duplex jobs in NSW: where they’re being lodged, and how builders find them

556 dual occupancy applications were lodged in NSW in 90 days, with a median cost of $858,000, and most were outside Sydney. Which councils lead, what a dual occ means for each trade, and how to hear about one the day it’s lodged.

The LodgedLeads team · · 2 min read

A dual occupancy, two homes on one lot, is a sweet spot for a lot of builders. It is bigger than a single house and simpler than a block of units, and the clients are often owners or small investors building one to live in and one to sell or rent. For the trades it means everything twice: two kitchens, two bathrooms, two driveways, two lots of fencing.

How many, and where

In the 90 days to 6 November 2026, 556 development applications in NSW included a dual occupancy, attached (a duplex) or detached. That is about 43 a week. The median estimated cost was $858,000.

Only 203 of them were in Greater Sydney. The busiest councils were:

  1. Maitland: 26
  2. Lake Macquarie: 24
  3. Central Coast and Canterbury-Bankstown: 22 each
  4. Shoalhaven and Cumberland: 18 each
  5. Sutherland Shire and MidCoast: 17 each

The Hunter and the Central Coast stand out. Land is cheaper, blocks are bigger, and a dual occupancy is a popular way to make a project stack up. If you build duplexes around Lake Macquarie, Maitland or Newcastle, there is a steady flow of work being lodged every week.

Bigger multi-unit jobs

Widen the net to everything with more than one dwelling, including terraces, townhouses, multi-dwelling housing, residential flat buildings and the subdivisions that often go with them, and there were 1,686 applications in the same 90 days. Shoalhaven (67), Maitland (51), Lake Macquarie (51), Liverpool (49) and Canterbury-Bankstown (47) led. See them all on the multi-unit developers page.

What a dual occupancy means for each trade

  • Builders. Many dual occ owners are first-time developers comparing builders while the DA is in. Being early matters.
  • Demolition. Most dual occupancies on established blocks start by knocking down the existing house.
  • Concreters and excavators. Two slabs or one long one, plus two driveways.
  • Plumbers and electricians. Separate services and meters for each dwelling.
  • Fencing and landscaping. A dividing fence, front fences and two sets of landscaping, often to a landscape plan that came with the DA.
  • Solar. Two roofs, two systems, and often a BASIX commitment to meet. Read what a BASIX certificate tells tradies.
A dual occupancy is two houses’ worth of work, sold to one client, on one site.

DA or CDC?

Some dual occupancies are approved as complying development, without a DA, where the site and design meet the state codes. Those won’t appear in a council’s DA list. The ones that need a DA, because of the zone, the lot, heritage, flooding or a design outside the codes, are the ones you can see early. More in DA vs CDC in NSW.

Hearing about them the day they’re lodged

LodgedLeads checks the NSW Planning Portal every 15 minutes. Choose your trade and your councils, and every dual occupancy, duplex and multi-unit application in them arrives in your inbox the evening it’s lodged, with the address, the cost, the status and a link to the plans. Browse current examples on the new home builders page, then start a 14-day free trial.

Figures are from NSW Planning Portal data for new development applications lodged between 8 August and 6 November 2026. Costs are the applicant’s own estimates.

Data source: NSW Planning Portal, NSW Department of Planning, Housing and Infrastructure, under Creative Commons Attribution. About the data.

More from the blog

Hear about the next job in your area first.

Start a free trial